Stevdat Lld. Giaan Towers, C11 Tema
Monday - Friday 08:00-16:00
026 536 9482

Installation & Commissioning a Pebble Crusher at Sadiola Gold Mine Mali in 2015

The Official Website of Stevdat Limited > Residential > Installation & Commissioning a Pebble Crusher at Sadiola Gold Mine Mali in 2015

Project Detailsx

Client:Envato Corps
Location:New York, USA
Value:$25,000
Year Completed:2015
Category:Hospitaly

Project Overviewx

In the modern industrialized world, construction usually involves the translation of designs into reality. A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants. The design team is most commonly employed by (i.e. in contract with) the property owner. Under this system, once the design is completed by the design team, a number of construction companies or construction management companies may then be asked to make a bid for the work, either based directly on the design, or on the basis of drawings and a bill of quantities provided by a quantity surveyor. Following evaluation of bids, the owner typically awards a contract to the most cost efficient bidder.